1
Quick Start
2
Site Preparation & Protection
3
Internal Demolition
4
Flooring Removal
5
Wet Area & Fixture Removal
6
Structural Demolition
7
Heavy Demolition & Machinery
8
Site Clearing & Vegetation Removal
9
External Demolition
10
Asbestos & Hazardous Material
11
Waste Removal & Cleanup
12
Review & Confirm
Quick Start
Quote It Yourself
Pick a ready-to-go project — pricing and inclusions are prefilled and can be edited later.
Want full control?
Hit Quote it Yourself.
bathroom demoliton
electrical disconnection
Plumbing cap off
tile removal
waste removal
Bathroom Strip out – Large
Asbestos removal
Asbestos testing
waste removal
Asbestos Removal – 10m2
Asbestos removal
Asbestos testing
waste removal
Asbestos Removal – 120m2
Asbestos removal
Asbestos testing
waste removal
Asbestos Removal – 50m2
bathroom demoliton
Plumbing cap off
skip bin
tile removal
waste removal
Bathroom Strip out – Small
electrical disconnection
kitchen demoliton
Plumbing cap off
skip bin
tile removal
waste removal
Kitchen Strip out – Large room
kitchen demoliton
Rubbish removal
skip bin
tile removal
Kitchen Strip out – Standard Size
Quote Yourself
What preliminary works are required before demolition begins?
Access & Safety Setup
Select & adjust each inclusion to suit your project
Inclusion
Quantity
1
Supply and install temporary site fencing
Site Prep
2
Install internal dust control sheeting & barriers
Site Prep
3
Erect demolition signage (site, entry, warning)
Site Prep
4
Disconnect basic services (power, water, gas)
Site Prep
5
Disconnect switchboard/fuse box
Electrical
6
Arrange council permit for demolition (if required)
Electrical
Surface & Fixture Protection
Select & adjust each inclusion to suit your project
Inclusion
Quantity
1
Cover windows with plywood for protection
Site Prep
2
Protect retained floors (sheeting/taping)
Site Prep
3
Remove and dispose of furniture/appliances
Site Prep
4
Protect retained cabinetry or joinery
Site Prep
What internal demolition works are required?
Wall & Ceiling Stripout
Select & adjust each inclusion to suit your project
Inclusion
Quantity
1
Remove internal wall linings (gyprock, VJ, villaboard)
Demolition
2
Remove ceiling linings (plasterboard, timber)
Demolition
3
Remove insulation (ceiling or wall batt)
Demolition
4
Remove internal non-load bearing stud wall
Demolition
5
Remove suspended ceiling grid and panels
Demolition
6
Remove plaster ceiling including cornices
Demolition
Fixtures, Doors, Trims & Joinery
Select & adjust each inclusion to suit your project
Inclusion
Quantity
1
Remove internal door and frame
Demolition
2
Remove built-in robe or fixed cupboard
Demolition
3
Remove architraves and window sills
Demolition
4
Remove skirting boards
Demolition
5
Remove built-in robe (fixed frame & doors, up to 2m)
Demolition
6
Remove oversized built-in robe (3-door or sliding, over 2m)
Demolition
Do you need any floor finishes or underlays removed?
Hard Flooring
Select & adjust each inclusion to suit your project
Inclusion
Quantity
1
Remove ceramic or stone tiles (incl. bedding)
Demolition
2
Remove strip timber floor (glued/nailed)
Demolition
3
Remove hybrid/laminate/floating floor
Demolition
4
Remove parquetry or glued timber blocks
Demolition
5
Grind off glue/adhesive from subfloor
Demolition
Soft Flooring
Select & adjust each inclusion to suit your project
Inclusion
Quantity
1
Remove carpet and underlay
Demolition
2
Remove vinyl sheet flooring
Demolition
3
Remove cork tiles or foam flooring
Demolition
Are you stripping out a bathroom, kitchen or laundry?
Kitchen Demo
Select & adjust each inclusion to suit your project
Inclusion
Quantity
1
Remove kitchen cabinets and benchtops
Demolition
2
Remove splashback tiles or wall panels
Demolition
3
Remove kitchen appliances (oven, dishwasher) per fixture
Demolition
4
Disconnect services
Plumbing
Bathroom/Laundry
Select & adjust each inclusion to suit your project
Inclusion
Quantity
1
Remove vanity, toilet and shower screen
Demolition
2
Remove laundry tub and upper cabinets
Demolition
3
Remove wall tiles (wet area)
Demolition
4
Remove floor tiles (wet area)
Demolition
5
Remove waterproofing membrane
Demolition
6
Remove built-in bath
Demolition
7
Remove wall niche or shaving cabinet
Demolition
8
Disconnect services
Plumbing
Are you demolishing any structural elements like walls, slabs, or joists?
Structural Elements
Select & adjust each inclusion to suit your project
Inclusion
Quantity
1
Remove brick/block wall (internal or external)
Demolition
2
Remove load-bearing stud wall (with props)
Demolition
3
Cut/remove concrete slab (up to 100mm)
Demolition
4
Remove concrete step or small plinth
Demolition
5
Remove ceiling joists (exposed)
Demolition
6
Remove lintel or beam
Demolition
For major structural removal, excavation of slabs/footings, and machinery work.
Heavy Demolition & Machinery
Select & adjust each inclusion to suit your project
Inclusion
Quantity
1
Demolish full external brick or block wall
Demolition
2
Demolish reinforced concrete slab (100–150mm thick)
Demolition
3
Demolish footing or pier (manual breakout and removal)
Demolition
4
Remove suspended concrete slab (elevated)
Demolition
5
Break and remove reinforced concrete driveway
Demolition
6
Excavate and remove concrete footings
Demolition
7
Mechanical demolition of brick chimney or flue
Demolition
8
Provide skid steer (Bobcat) and operator – day rate
Demolition
9
Provide 5T–8T excavator and operator – day rate
Demolition
10
Hammer/breaker attachment hire (incl. operator)
Demolition
Clearing trees, debris, topsoil or growth prior to new builds or slabs.
Site Clearance
Select & adjust each inclusion to suit your project
Inclusion
Quantity
1
Clear site of light vegetation & debris (basic scrub)
Demolition
2
Remove small tree or shrub (under 3m)
Demolition
3
Remove large tree (3m+ incl. stump grind)
Demolition
4
Excavate and remove tree stumps (1T–5T machine)
Demolition
5
Strip and remove topsoil layer (to 100mm)
Demolition
6
Load and remove green waste per
Demolition
7
Provide tipper truck for spoil disposal (up to 6T)
Demolition
8
Level and prepare cleared site (minor grading)
Demolition
Do you need to remove external structures, cladding, or fences?
Exterior Elements
Select & adjust each inclusion to suit your project
Inclusion
Quantity
1
Remove external cladding (weatherboard, fibro, metal)
Demolition
2
Remove brick veneer or rendered cladding
Demolition
3
Remove eaves and soffits
Demolition
4
Remove external window or door
Demolition
5
Remove pergola or verandah (timber or metal)
Demolition
External Structures
Select & adjust each inclusion to suit your project
Inclusion
Quantity
1
Remove carport (freestanding or attached)
Demolition
2
Remove garden shed (metal or timber)
Demolition
3
Remove timber or metal fence
Demolition
4
Remove letterbox or gate post
Demolition
5
Remove concrete retaining wall (under 1m)
Demolition
Roofing Removal
Select & adjust each inclusion to suit your project
Inclusion
Quantity
1
Remove corrugated metal roofing (Colorbond/Zincalume)
Demolition
2
Remove tiled roof (terracotta or concrete tiles)
Demolition
3
Remove flat metal roof with insulation blanket
Demolition
4
Remove roof battens (timber or metal)
Demolition
5
Remove sarking or roof underlay
Demolition
6
Strip complete roof (tiles + battens + underlay)
Demolition
Do you require asbestos testing or removal?
Asbestos Works
Select & adjust each inclusion to suit your project
Inclusion
Quantity
1
Arrange asbestos test & certificate
Demolition
2
Remove bonded asbestos sheeting
Demolition
3
Remove asbestos eaves or panels
Demolition
4
Bag, wrap and legally dispose of asbestos
Demolition
Would you like rubbish removal and final site cleanup included?
Waste & Skip Management
Select & adjust each inclusion to suit your project
Inclusion
Quantity
1
Provide small skip bin (2m³)
Rubbish Removal
2
Provide large skip bin (6–8m³)
Rubbish Removal
3
Manual loading of debris + dump fees
Rubbish Removal
4
Separate and recycle materials (metal, brick, timber)
Rubbish Removal
General Labour / Hourly Site Work
Select & adjust each inclusion to suit your project
Inclusion
Quantity
1
General demolition labour – 1 worker
General Labour
2
General demolition crew – w workers
General Labour
3
On-site demo assistant (labour only, no tools)
General Labour
4
Final builder support labour – post-cleanup
General Labour
Site Finalisation
Select & adjust each inclusion to suit your project
Inclusion
Quantity
1
Final sweep and surface clean
Cleaning
2
Water down dust and hose hardstand
Cleaning
3
Take final photos & conduct site handover
Cleaning
Total Estimate Range
Full Breakdown Ready
Whats the address?
Ready to start – I’ve planned everything
Budgeting seriously – I want accurate costs
Comparing quotes – I have others already
Exploring ideas – Just want a rough price
Need pricing for bank, strata or loan approval
Just curious – Not serious.
What stage are you at?
When do you want it done? (Approx)
Your Name
Email
Phone Number
Already registered?
Sign in here
Email
Password
New here?
Create an account
Describe what you need done
Upload photos to help with planning
Click here to upload (Optional)
Save →
Saving Your Project..
Next →
Assign Client
Add a client to the project, you can also do this after the project is created
Search by email or phone
Vasile Darmaz
Client
vasiledarmaz0025@hotmail.com
Search
Please wait...
Invite
The user will receive the invitation via E-mail.
Full Name
Mobile Number
E-Mail
Back to Search
Invite User
Please wait...
Edit Quote Package
Package Title
Tags
Image